Williams Tower Site Project

Williams Tower Site Project

Plateau was retained to conduct a cultural resource survey prior to the construction of a communication tower overlooking the Walla Walla River valley in Umatilla County, Oregon. According to the pre-field review, no previous cultural resource surveys have been conducted within the project area. However, a survey was performed within two miles of the project […]

Mason Communication Tower

Mason Communication Tower

Inland Cellular proposes to lease a 40‐x‐60‐foot area in a host parcel near Walla Walla to construct a 120‐foot communication tower with associated equipment. The project area covers less than 1.0 acre, and Plateau was retained to identify, document, and evaluate historic properties and assess the potential effects the tower’s construction could have on properties […]

Delaney Co-Locate Communication Tower

Delaney Co-Locate Communication Tower

This proposed project is the installation of antenna on an existing 120-foot self-support lattice communication tower located in Columbia County, Washington.  The antenna will be placed at 30 feet above ground.  The area of potential effect is the leased ground area, measuring 6 x 22 feet, for associated equipment. Pre-field research revealed three previously recorded cultural […]

Wanser Communication Tower

Wanser Communication Tower

This proposed project is the construction of a 150-foot self-support communication tower in Walla Walla County, Washington.  The tower will be placed adjacent to an existing 120-foot communication tower.  The area of potential effect (APE) is in a 50 x 50 foot leased area. Pre-field research revealed no previously recorded cultural resources within 1.0 mi (1.6 […]

White Bird Communication Tower

White Bird Communication Tower

This proposed project is the construction of a 280-foot self-support lattice communication tower and the installation of the associated equipment.  The area of potential effect (APE) is the area required for the construction of the tower, and covers less than 1.0 acre located on the uplands overlooking the town of White Bird.  The facility will […]

Juliaetta Communication Tower

Juliaetta Communication Tower

This proposed project is the construction of a 120-foot self support lattice communication tower and the installation of the associated equipment. The Project Area covered less than 1.0 acre and overlooked the town of Juliaetta. The facility will be located within a 100-x-100-foot fenced area. Power will be supplied via an existing overhead power route. […]

Mason Butte Communication Tower

Mason Butte Communication Tower

This proposed project is the construction of a 150-foot self support lattice communication tower and the installation of the associated equipment. The area of potential effect (APE) is the area required for the construction of the tower and equipment, and totals less than 1.0 acre. Pre-field research consisted of a file search at the Nez […]

Plummer, ID Communication Tower

Plummer, ID Communication Tower

AT&T proposes to replace three of the existing panel antennas with three new Long Term Evolution (LTE) antennas at an existing communication tower located on Mason Butte in Kootenai County, Idaho.  Three remote radio head (RRH) units will be added to the tower at roughly the same elevation as the antennas.  Telco equipment within the […]

Goldendale Communication Tower

Goldendale Communication Tower

Verizon Wireless proposes to lease a 50-x-50-foot area on a host parcel in Goldendale, Klickitat County, Washington.  This proposed project is the construction of a 65-foot monopole communication tower and the installation of the associated equipment.  The area of potential effect is the area required for the construction of the tower, and covers less than […]

Decatur Communication Tower

Decatur Communication Tower

Verizon Wireless proposes to lease a 50-x-50-foot area on a host parcel in Sunnyside, Washington and construct a 100-foot monopole communication tower.  The installation will include the necessary telecom equipment, and the facility will occupy less than 1.0 acre. Background research indicated the proposed undertaking was located in an area of high risk for encountering […]

Load More