
Williams Tower Site Project
Plateau was retained to conduct a cultural resource survey prior to the construction of a communication tower overlooking the Walla Walla River valley in Umatilla
Plateau was retained to conduct a cultural resource survey prior to the construction of a communication tower overlooking the Walla Walla River valley in Umatilla
Plateau Archaeological Investigations conducted the archaeological monitoring for the Granger Wastewater Facility and Sewer Improvements located within the existing wastewater treatment facility and Hisey Park
Plateau Archaeological Investigations conducted a Historic Property Inventory for the city of Spokane. The area of interest spans Bigelow Gulch Road from Havana Street to
The Town of Winthrop is proposing to construct an extension to the existing Susie Stevens Trail system that connects the downtown with areas south of
The Town of Winthrop is proposing to construct a trail near the downtown along the northeast side of the Chewuch River. The trail will extend
The Town of Winthrop is planning additional water system improvements which implements aspects of the Town’s six year plan addressing water quality, reliability, maximum demand,
Gebbers Farms is preparing to lease several tracts of land in south central Okanogan County for agricultural use. The tracts are all located within the
Gebbers Farms is in the process of leasing seven tracts of land for agricultural use in south central Okanogan County. All of the tracts are
After an archaeological data recovery from a known site near Curlew Lake in 2008, it was determined that the deposits of two proposed home sites
Upper Valley MEND (Meeting Each Need with Dignity) is planning a mixed income residential development to provide affordable housing for residents in the Leavenworth valley.
Fill in your details and we’ll get back to you in no time.
Thank you for your submission! We will get in touch with you shortly.